The Institut de Schaltin called on Coretec Energy to reduce its heat consumption. The mission was to install a biomass boiler supplied with pellets and a 350 kW back-up fuel oil boiler. A heat network was also set up to supply ten heat exchange substations. Coretec then took charge of the entire regulation of boiler and the ten buildings.

Project specificity

  • Site completed during the school holiday period (July-August)
  • Conversion of an existing restoration in boiler building
Télécharger la brochure

Similar projects

ANNUAL GAINS

ANNUAL GAINS

CO2 savings

220 T/year

SO2 savings

415 KG /year

Payback time

4,8 years

INSTALLATION

INSTALLATION

Brand

Froling

Type

TX 250

Fuel

Pellets

Consumption

174T/year

Thermal power

250 kW

Nominal total return

92 %

Heat network

420 m (10 substations)

PLANNING

PLANNING

Project start

August 2015

Commissioning

October 2015

Temporary reception

December 2015