Arcelor Mital called on Coretec to carry out a full re-lamping on the new coating line of the Liège site. This led to a reduction of 75 % of the installed capacity while doubling the lighting level.

Similar projects

GAINS

GAINS

Installed power

-75%

Illumination level

x2

CO² savings

-50T/year