References

Hospital Iris Sud

Hospital Iris Sud Hospital Iris Sud Hospital Iris Sud

Project display

The Hospital IRIS SUD entrusted CORETEC Energy with enabling the self-production of some of its hot water and electricity required for the needs of the hospital site. This installation generates an annual saving of € 85,000 for the hospital.

Télécharger la brochure

Similar projects

ANNUAL GAINS

ANNUAL GAINS

CO2 savings

130 T/year

Electricity production

910 MWh

Payback time

3,5 years

INSTALLATION

INSTALLATION

Brand

Viessmann

Type

EM140/207

Gas consumption

384 kW

Electrical power

140 kW

Thermal power

207 kW

Nominal total return

90,4 %

PLANNING

PLANNING

Project start

January 2015

Temporary reception

September 2015