References

MUNICIPALITY OF WELLIN

MUNICIPALITY OF WELLIN MUNICIPALITY OF WELLIN MUNICIPALITY OF WELLIN

Project display

The municipality of Wellin called on Coretec Energy to reduce the heat consumption of its omnisport hall. For this purpose, a pellet boiler of 180 kW was installed. Coretec was also responsible for rebuilding the site’s entire ventilation (GP 12000 m³/h), as well as the fully centralised control and rehabilitation of the boiler room’s fire safety standards. As the Omnisport hall needed a continual supply of hot water, the site took place with no stoppage of hot water production and within a very short installation time.

Project specificity

  • Project carried out in one month
  • Continuous production of hot water on the site
  • Call for tender
Télécharger la brochure

Similar projects

ANNUAL GAINS

ANNUAL GAINS

CO2 savings

91 T/year

SO2 savings

173 KG /year

Payback time

4,7 years

INSTALLATION

INSTALLATION

Brand

Herz

Type

Firematic 180

Fuel

Pellets

Consumption

45,6 T/year

Thermal power

180 kW

Nominal total return

92 %

 

PLANNING

PLANNING

Project start

April 2014

Temporary reception

May 2014