References

GRAND HOSPITAL OF CHARLEROI

GRAND HOSPITAL OF CHARLEROI GRAND HOSPITAL OF CHARLEROI GRAND HOSPITAL OF CHARLEROI

Project display

The Grand Hospital of Charleroi entrusted CORETEC Energy with enabling the self-production of some of the hot water and electricity required for the needs of the hospital site. This installation generates an annual saving of € 135,000 for the hospital.

Télécharger la brochure

Similar projects

ANNUAL GAINS

ANNUAL GAINS

CO2 savings

240 T/year

Electricity production

1650 MWh

Payback time

4 years

INSTALLATION

INSTALLATION

Brand

Tedom

Type

Cento L330

Gas consumption

617 kW

Electrical power

248 kW

Hot water power 90°C

305 kW

Hot water power 45°C

12 kW

Nominal total return

91,6 %

PLANNING

PLANNING

Project start

May 2015

Commissioning

January 2016