Implementation of a recovery system on the flue gas of the flame oven to heat hot water previously heated with fuel oil via the steam boiler.

Télécharger la brochure

Similar projects

ANNUAL GAINS

ANNUAL GAINS

CO2 savings

130T/year

Thermal production

424 MWh

Annual profit

18.500 €

Payback time

4,8 years

INSTALLATION

INSTALLATION

Installed power

150 kW

Smoke temperature IN/OUT

275/120°C

Water heating process

60°C

Thermal storage

6m³ water

PLANNING

PLANNING

Project start

September 2005

Commissioning & reception

January 2006