Installation of a trigeneration system on the site of Soprema, in the town of Bergamo. This installation enables the simultaneous production of 800 kW of electricity (100 % self-consumed) to 916kW of hot water and 841kW of chilled water from a single source: natural gas.

Project specificity

  • Trigeneration project
  • International project
Télécharger la brochure

Similar projects

ANNUAL GAINS

ANNUAL GAINS

Electricity production

8.779 MWh

Annual profit

350.000€

Payback time

4,5 years

INSTALLATION

INSTALLATION

Model

ETW Energietechnik GmbH

Gas consumption

1963 kW

Electrical power

800kW

Hot water power

980kW

Nominal return

87,4%

Absorbtion Chiller

Thermax 5G 4L C

Coefficient of performance

0,77

PLANNING

PLANNING

Project duration

1,5 years