References

Municipality of Welkenraedt

Municipality of Welkenraedt Municipality of Welkenraedt Municipality of Welkenraedt

Project display

The municipality of Welkenraedt called on Coretec Energy to reduce its heat consumption. The mission was to replace the existing gas boiler of 180 kW with a pellet boiler of 60 kW and a backup gas boiler of 120 kW. The electricity, hydraulics and regulation of the boiler were also completely revised during the site.

Project specificity

  • Removal of asbestos from the premises hosting the project
  • Call for tender
Télécharger la brochure

Similar projects

ANNUAL GAINS

ANNUAL GAINS

CO2 savings

40 T/year

SO2 savings

105 KG /year

Payback time

3,9 years

INSTALLATION

INSTALLATION

Brand

Herz

Type

Pelletstar

Fuel

Pellets

Consumption

44,3m³/year

Thermal power

60 kW

Nominal total return

92 %

PLANNING

PLANNING

Project start

March 2013

Temporary reception

July 2013