The Institut de Schaltin called on Coretec Energy to reduce its heat consumption. The mission was to install a biomass boiler supplied with pellets and a 350 kW back-up fuel oil boiler. A heat network was also set up to supply ten heat exchange substations. Coretec then took charge of the entire regulation of boiler and the ten buildings.
CO2 savings
220 T/year
SO2 savings
415 KG /year
Payback time
4,8 years
Brand
Froling
Type
TX 250
Fuel
Pellets
Consumption
174T/year
Thermal power
250 kW
Nominal total return
92 %
Heat network
420 m (10 substations)
Project start
August 2015
Commissioning
October 2015
Temporary reception
December 2015